top of page

Wastewater Treatment Plant
Questionnaire

Fill out the form below for a quick and easy way to speed up your quote. If you are unsure about the size of the treatment system needed, try our downloadable calculator below.

If you are unsure about the size of the treatment system needed, try our downloadable calculator here.

Onsite Power (Phase & Voltage)

Discharge Limits

(30/30 assumed if under 25,000 GPD)

(20/20 assumed if under 50,000 GPD)

(10/15 assumed if under 100,000 GPD)

Above are the minimum requirements IF you are not discharging to an IMPAIRED WATERWAY. Most parishes have impairments.

Project Details

Permitting

DEQ:

Request for preliminary determination submitted?
Notice of intent (NOI) submitted:

LDH:

LDH Application Submitted:
How Did You Hear About Us?

Thanks for submitting! We will be in contact soon!